OEM/ODM / Development Process

How a custom e-bike project actually runs.

From first enquiry to shipment, the commercial scope, specification and approval gates stay visible throughout the programme.
Mobimax electric platform developmentBrief / Build / Approve / Deliver

Commercial framework

The points agreed before production begins.

MOQ, sample terms, tooling, payment and lead times are confirmed in writing against the selected platform and scope.
01

Order scope

Existing-model and full ODM programmes are assessed separately, with the applicable order structure confirmed before quotation.

02

Sample & tooling

Any sample, setup and tooling requirements are itemised before a project moves beyond feasibility.

03

Payment & delivery

Payment milestones, documentation and the production schedule are agreed alongside the approved specification.

Before production

Commercial details, made clear.

Programme scenarioCommercial scopeWhat is confirmed
Existing model with brandingReference model, finish and required brandingOrder structure, sample route and delivery plan
Existing model with component changesMotor, battery, drivetrain or market configurationSupplier implications, validation plan and commercial scope
New frame or full ODM programmeNew design direction, engineering and tooling requirementsDevelopment stages, ownership terms and production route

Project-specific MOQ, fees, payment terms and timings are issued in the written quotation rather than assumed from a generic product page.

Seven stages

From enquiry to shipment, step by step.

Each stage has a named output and approval point, so responsibilities stay clear on both sides.
  1. 01

    Enquiry & feasibility

    Share your target market, intended volume, target retail price and product type. We review feasibility and the likely programme route before detailed work begins.

    Stage 01
  2. 02

    Specification lock

    Agree the complete bill of materials, market settings and branding. The specification is the signed reference for sample and production work.

    Stage 02
  3. 03

    Sample build

    Build a sample to the agreed specification, complete internal checks and provide build evidence for your review.

    Stage 03
  4. 04

    Sample approval

    You test the sample and confirm approval or changes in writing. Production does not begin until the specification is approved.

    Stage 04
  5. 05

    Certification

    Plan destination-market testing and documentation alongside production preparation where the programme requires it.

    Stage 05
  6. 06

    Mass production

    Coordinate component procurement, assembly and defined in-line quality checks against the approved programme.

    Stage 06
  7. 07

    Inspection & shipment

    Complete pre-shipment inspection, loading records and the export documentation needed for delivery.

    Stage 07

Production milestones

See the work at the points that matter.

First articleCheck the first complete unit against the approved sample and specification.
In-line qualityReview inspection points as production moves through assembly.
Pre-shipmentArrange attendance, agent or third-party inspection before loading.
Loading recordReceive packing and export documentation with the shipment handover.