OEM/ODM / Configuration checklist

Prepare a configuration worth reviewing.

Start with a reference e-bike. Separate branding, component changes and engineering work so the team can assess the right specification.

01 / Review together

Branding and presentation

Identify the artwork and finish that need approval against the chosen model.

  • Logo placement, vector artwork, colour references and graphics.
  • Carton artwork, manuals, labels and the receiving team’s assembly needs.
  • Any display start screen or digital branding request, subject to system availability.
02 / Review together

Component choices

Record the requirement for each system. Examples are discussion directions, not a package available on every model.

  • Drive: hub or mid-drive direction; matching controller, battery, BMS and charger.
  • Rider controls: cadence or torque sensing, display and any connectivity request.
  • Mechanical equipment: drivetrain, brakes and suspension requirements.
  • Nominated suppliers: provide technical documentation and representative samples for integration review.
Review engineering and validation
03 / Review together

Whole-vehicle requirements

A parts list alone does not define a complete vehicle.

  • Wheel and tyre dimensions; step-over, step-through or folding format.
  • Racks, mudguards, baskets and required mounting points.
  • Destination-market settings, labels and equipment requirements.
  • Frame geometry, dedicated tooling or electrical integration needs must be identified as engineering work.
04 / Review together

Delivery and production implications

Explain how the product will be received and supported. Factory information is maintained separately from configuration choices.

  • Packaging and assembly level at arrival.
  • Required sample, inspection and delivery milestones.
  • Any parts or service-information needs for your receiving operation.
Review production and delivery planning
05 / Review together

Make the change request specific

A useful brief distinguishes fixed requirements from options the team can help evaluate.

  • Reference model, destination market and intended use.
  • Required changes, expected quantity and target schedule if known.
  • The sample or written specification against which changes will be approved.
Discuss the technical brief
06 / Review together

Before approving a substitution

Review a proposed component change before treating it as equivalent.

  • Identify the changed part and the configuration revision.
  • Confirm compatibility and the implications for testing, documents and timing.
  • Record the decision in the agreed specification.
Review project approval checkpoints

Your next step

Bring the model and the changes you need.

Build your spec
WhatsApp Sales